Procedure

Procedure

The Dutch Float Dike will be constructed by a local contractor.

If a contractor wishes to include the Dutch Float Dike in a project proposal, a contract will be established beforehand.
Dutch Float Dike and the contractor will sign a mutual non‑disclosure agreement and define the division of responsibilities and compensation. Dutch Water Prevention acts as the coordinating partner.

During the preparation phase, Dutch Float Dike can provide cost estimates, standard animations, and the design principles needed to create the engineering design.

The contractor or its engineering firm must create a site‑specific design based on these principles.

Dutch Float Dike can assist, but design responsibility remains with the executing contractor or engineering firm.